Wespray applied the “Faux Pave” decorative stencil finish to various sections of the project. This included extensive stencil treatments to the new Perth Transit Authority (P.T.A) train station carpark covering pedestrian crossing refuge islands, pathways, roundabouts and traffic islands on the feeder roads into the new carparks. A red herringbone finish with matching headers was applied to these areas totalling more than 2100m².
The main Armadale Road re-alignment consisted of multiple new intersections and upgrades to local roads. Over 3500m² of a grey herringbone look faux pave was applied to the traffic islands, footpath infills and roundabouts. A further 2000m² were required in different stencil styles to tie into existing road infrastructure treatments including the red brick stretcher bond effect.