Working within a live fuel station precinct.Project included 800m2 of a faux paved tile effect. Including 11 pedestrian crossing points to multiple fast food sites....
The indoor assembly/canteen area were treated in a solid French Grey with an aggregate fleck which included the ramp to the stage area....
Working with Santelli Architects, Aranmore Catholic Primary School required a slip reducing finish to the recently completed classroom corridors, stairwells and undercover assembly area....
For urgent enquiries, please call: 0418 429 499