fbpx
Skip to main content

Hale Aquatic Centre

P.S. Structures had recently built the new aquatic centre with concrete terraces and seating. Wespray applied a textured slip reducing finish to all steps and landings on the terraces in a neutral concrete colour.
Special measures were put in place including extra barricading and floor protection to ensure no run off or overspray contaminated the swimming pool. This enabled students to use the pool while works were being undertaken.

Related Projects

Form Logo

Get in touch

For urgent enquiries, please call: 0418 429 499

This field is for validation purposes and should be left unchanged.