Hale Middle School in Wembley Downs required a durable textured finish to the slippery smooth concrete corridors and common areas on the ground and first floor.

The project was completed in December 2010.

Scheduling during the school holidays enabled the whole project to be completed within two weeks with no disruption to staff or students.

A durable extended wear sealer was applied to keep the surface protected and for ease of cleaning. Colours used were bluestone as the main with a white and charcoal-contrasting fleck.

The Junior school had layers of old paint flaking from the surface. This was ground back to bare concrete in the preparation process.

A solid French grey coat was applied with flecks and all stair treads were highlighted with a contrasting colour for added safety.